FYP2 Presentation Day
This week is a presentation week for FYP2 also know as Industrial Day. It was held on Friday 16 May 2014, from 9.00 AM until 12.00 AM at Gemilang Hall of UniKL-BMI. On last Monday I already print out the poster for my presentation. The presentation required the student to present about the project. My presentation has been assess by two assessors, representatives from TNB.
Sunday, May 18, 2014
Friday, May 9, 2014
Week 13: (5/5/14 - 9/5/14)
Poster Design
A poster has been design in Power Point on A1 size which is 59.4 x 84.1 cm. Since next week is the Industrial Day, I have to finish the poster by this week. The poster consist of abstract, objective, methodology, results and conclusion. For the results part, I only show one example due to limited space.
A poster has been design in Power Point on A1 size which is 59.4 x 84.1 cm. Since next week is the Industrial Day, I have to finish the poster by this week. The poster consist of abstract, objective, methodology, results and conclusion. For the results part, I only show one example due to limited space.
Saturday, May 3, 2014
Week 12: (28/4/14 - 2/5/14)
Troubleshooting and Testing
For this week, I have done some troubleshooting for my project. However the output still didn't show any value like I expected. I have to get ready for my presentation day. Here is a video I made for my project.
A Development of A Simple Buck Boost Converter Using Pulse Width Modulation
For this week, I have done some troubleshooting for my project. However the output still didn't show any value like I expected. I have to get ready for my presentation day. Here is a video I made for my project.
A Development of A Simple Buck Boost Converter Using Pulse Width Modulation
Subscribe to:
Posts (Atom)